TABLE OF CONTENTDescriptionPage No.Notice To TenderersNT/1-3Form Of TenderFT/1-2Bank Guarantee Form For Performance BondBG/1-2Agreement And Conditions Of Building ContractTable of Contentsi-vArticle Of Agreement1-6Conditions Of Building Contract7-31Additional Clause 36 To The Conditions Of Contract31AAppendix To Conditions Of Contract32AppendicesAppendix I-List of drawingsAPI/1-5Appendix II-Details of tendererAPII/1-2Appendix III-Previous projects undertakenAPIII/1Appendix IV-Current projects undertakenAPIV/1Appendix V-Major items of plant equipment proposedAPV/1Appendix VI-Personnel for this contractAPVI/1Appendix VII-Sub-contractors for this contractAPVII/1Appendix VIII-Labour rates for dayworkAPVIII/1察wwprk J.APVIII/2Structural SpecificationSection 1:Concrete1-8Section 2:Formwork9-14Section 3:Reinforcement15-17Section 4:Blockwork18-21Section 5:Structural Steelwork22-32Section 6:Precast Concrete33-57Annex Equivalent Chinese Structural Steel Sections2 pagesCivil Works SpecificationsPart 1:Site Works18 pagesPart 2:Water Supply8 pagesPart 3:Sewerage Reticulation8 pagesPart 4:Drainage10 pagesPart 5:Road Furniture And Markings5 pagesPreambles To All TradesPT/1-13Bill Of QuantitiesBill No.1-Preliminaries and generally1/1-1/70Bill No.2-3-Storey Shopping Complex2/1-82Bill No.3-External Works3/1-21Bill No.4-Prime Cost and Provisional Sums4/1-3General Summary Of TenderGS/1理筑素前网Z.ZC.NE1
NOTICE TO TENDERERS1.Tenders are open to invited contractors for Construction And Completion OfThe Proposed 3-Storey Shopping Complex On Allotments 7,8 9 TogetherWith One 20-Metre Road Reserve At Section 429,Hohola,NCD,Papua NewGuinea up to 4:30 pm on 15th March 2008 subject to the following conditions:-a)Tenders will be considered for acceptance only on the Tender Form providedwhich must be submitted in an envelop clearly marked "CONSTRUCTIONAND COMPLETION OF THE PROPOSED 3-STOREY SHOPPINGCOMPOLEX ON ALLOTMENTS 7,8 9 TOGETHER WITH ONE 20METRE ROAD RESERVE AT SECTION 429,HOHOLA,NCD,PAPUANEW GUINEA"addressed to:-DYNASTY DEVELOPMENT LIMITEDLot 1,Section 479,OR c/o:Rimbunan Hijau Sdn.Bhd.Kennedy Road,Gordons,No.66-78,Pusat Suria Permata,P.O.Box 102,Jalan Upper Lanang,Port Moresby,96000 Sibu,Sarawak,Papua New Guinea.Malaysia.Tel:6753254578Tel:6084216155b)Tender Document and Drawings will only be issued to invited tenderers onpayment of a non-refundable and deemed reasonable Document Fee of KinaK5,000.00 in the form of bank draft made payable to Dynasty DevelopmentLimited.c)In addition,each tender must be accompanied by an Earnest Money (TenderDeposit)of K20,000.00 in the form of bank draft made in favour of DynastyDevelopment Limited.The said Earnest Money (Tender Deposit)will beforfeited in the event that a tenderer refuse to sign the contract after histender has been accepted or if he withdraws his tender before expiry of thetender validity period.The Earnest Money of all unsuccessful tenderers,subject to receipt of a bonafide tender and return of all Tender Drawings and Document,will bedischarged free of interest after expiration of the tender validity period orafter the tender has been awarded to the successful tenderer whichever is theearlier.The Earnest Money of the successful tenderer will be discharged freeof interest after he has furnished the necessary Surety/Performance Bond orBank Guarantee for the due performance of the works as required in thecontract.d)A tenderer should be legally capable of making a contract and should beunder no disability.e)A tenderer may not submit more than one tender in respect of this contract.NT/1理筑素前阀Z.ZC.ET
f)The Tenderer must ensure that his tender submission includingaccompanying documents shall be firmly and functionally intact in preferablyone piece.Tender forms and Schedules shall be duly filled in and no changeshall be made to the wordings thereof.Any corrections shall be made clearlyand initialed by the Tenderer's authorized representative signing the tender.The Employer does not hold himself responsible for loss or misplacement ofloose documents.Mutilated or defaced tender forms may be rejected.g)The work or service for which this tender will be received shall be carried outin accordance with the Drawings as specified together with the GeneralConditions of Contract,Specifications,Schedules and such further drawingsand instructions as will be issued during the performance of this work.h)1)The tenderer shall state in his tender a firm Lump Sum for thoroughcompletion of the works as shown and described in the drawings and allcontingencies and liabilities to which he is or may become liable under thesaid Drawings,Bills of Quantities,Schedules,General Conditions of Contractand Specifications.The price quoted by the tenderer for the contract shall befirm during the performance of the contract.The contract sum will not besubject to any price adjustment due to fluctuation or hike in prices or rates ofmaterials,labour,plant,fuel,transport and duties.2)The SUM above should account for all terms and conditions as laid downin the Drawings,Bills of Quantities,Schedules,General Conditions ofContract and Specifications.Any clarifications which the tenderer wishes tomake must be stipulated in a covering letter and not at the back of the TenderForm or elsewhere.The tenderer shall also present documentary evidencethat he is qualified,experienced and has the necessary technical and financialcapabilities to perform the contract if his tender proposal is acceptedThe tenderer whose tender is accepted shall when required enter into aformal contract with the Employer for the due execution of the Works.j)The tender will remain open for acceptance for a period of one hundredtwenty(120)days from the day the tenders close.2.The Employer does not bind himself to accept the lowest or any tender.TheEmployer may annul the Tendering process and reserves the right to reject anyTender for any reason whatsoever without thereby incurring any liability to anyTenderer and without being required to offer any explanation for such action.The Employer reserves the right to waive any irregularity in any Tendersubmitted.Any Tender considered by the Employer as being unacceptable orunresponsive will be rejected.Illegal or unethical conduct or attempts toinfluence the Employer's evaluation of the Tenders outside of the normal biddingprocess will result in disqualification of the Tenderer.NT/2興尚理筑素前网Z.ZC
3.The tender drawings and document issued are similar in numbers and content tothe tender table document.The tender table document and drawings could beviewed during office hours at the office of the Architect.4.All Tenderers must at their own expenses visit and examine the site to obtain forthemselves all information that may be necessary to compile the tender;AllTenderers must examine carefully the Tender Documents in order to ascertain allmatters which are required and satisfy themselves the risks and obligations theyare to undertake.5.By virtue of submitting his Tender,the Tenderer asserts that he has,on his ownresponsibility and at his own expenses,inspected and examined the site and itssurrounding,public utilities and installations in or around the site,existingamenities,structures and infra works and including other matters relevant to theexecution of the Works and obtained all the information which are considerednecessary for the purpose of tendering.The tenderer shall be deemed to havesatisfied himself as to the form,nature,constraints and limitation of the site,theextent,nature,practicality and difficulties of the Work,the extent of temporary,protective and precautionary works required,the means of access andtransportation,the availability of materials,labours,plants and equipment,thenature of the soil and strata in or on which the Works is to be constructed,roadtraffic conditions,weather conditions,country or location conditions and ingeneral shall satisfy himself and obtain all necessary information as to the risk,contingencies,and other circumstances which may influence or affect its Tenderand to have taken the same into consideration and made adequate allowancestherefore in his Tender.6.If the Tenderer is in doubt as to the true meaning of any part of the TenderDocuments or Drawings,he should at once notify the Architect in writing andrequest clarification before the date fixed for receiving tenders.Any clarificationgiven out will be valid only if made by the Consultant by means of a formal letter.7.Prior to the specified tender closing,the Consultant may issue Addenda to clarify,modify or amend the Tender Documents.A set of each Addendum will be issuedto every Tenderer and the Addendum shall become part of the TenderDocuments.Receipt of each Addendum must be acknowledged on the formissued with the Addendum.8.The Employer will not be responsible or pay for any expenses incurred by thetenderer in connection with the preparation of the tender.Date:……Dynasty Development LimitedNT/3置素衬网Z.ZC
FORM OF TENDERTENDER FOR:CONSTRUCTION AND COMPLETION OF THEPROPOSED 3-STOREY SHOPPING COMPOLEX ON ALLOTMENTS 7,8&9 TOGETHER WITH ONE 20 METRE ROAD RESERVE AT SECTION429,HOHOLA,NCD,PAPUA NEW GUINEATo:DYNASTY DEVELOPMENT LTD.Lot 1,Section 479,ORc/o:Rimbunan Hijau Sdn.Bhd.Kennedy Road,Gordons,No.66-78,Pusat Suria Permata,P.O.Box 102,Jalan Upper Lanang,Port Moresby,96000 Sibu,Sarawak,Papua New Guinea.Malaysia.Tel:6753254578Te1:6084216155Sir,1.Having examined the Conditions of Contract,Drawings,Specifications,Bills OfQuantities,Schedules,Preliminaries and other supplementary documentsprepared for the above mentioned Works,we offer to execute and complete thewhole of the said Works in conformity therewith and in accordance with thedetails entered in the Appendix to the Conditions of Contract within theconstruction period of 18 months mentioned therein for the lump sum of Kina:(K2.We also undertake to complete and deliver the whole of the Works comprised inthe Contract on the same basis and Conditions mentioned above but with analternative construction period of_months for the lump sum of Kina:(K3.We agree that the tender prices quoted by us for the Works shall be firm duringthe performance of the Contract and not subject to price adjustment due tofluctuation in prices or rates of materials,labour,plant,fuel,transport and duties.4.We understand that the laws of Papua New Guinea will take precedence over thelaws of other country mentioned in the tender document in the event ofcontradiction and that the laws of Papua New Guinea shall govern the validity,application,interpretation and implementation of the Contract.5.If our tender is accepted we will provide a performance bond/surety or bankguarantee in the amount stated in the Appendix for the due performance of theContract,deposit the Workmen's Compensation,Public Liability and CARInsurance Policies and any other policies as required under this Contract andproduce the receipts for premiums paid.FT/1理筑素前阀Z.ZC.ET
BANK GUARANTEE FORM FOR PERFORMANCE BONDTHIS AGREEMENT is made the day of20between(insert name of Bank)of(insert Bank's principal address of business)(hereinafter called the "Guarantor")of the one partand(hereinafter called the "Principal")of the other part.WHEREAS1)This Agreement is supplemental to a Contract (hereinafter called the "Contract")dated theday of20_and made between(insertname of Contractor)(hereinafter called "the Contractor")of the one part and thePrincipal of the other part whereby the Contractor agreed and undertook to(state nature of works or obligations undertaken)for the sum of(state value for Contract price).The Guarantor has agreed to guarantee the due performance of the said Contractin the manner hereinafter appearing.ow黑c总黑e小1)If the Contractor (unless relieved from the performance by any clause of theContract or by statute or by the decision of a tribunal of competent jurisdiction)shall in any respect fail to execute the Contract or commit any breach of hisobligations thereunder then the Guarantor shall pay to the principal up to and notexceeding the sum of Kina(Krepresenting 5%of the Contract value or such part thereof on the Principal'sdemand not-withstanding any contest or protest by the Contractor or by theGuarantor or by any other third party.Provided always that the total of all partialdemands so made shall not exceed the sum of Kand thatthe Guarantor's liability to pay the Principal as aforesaid shall correspondingly bereduced proportionate to any partial demand having been made as aforesaid.2)The Guarantor shall not be discharged or released from this Guarantee by anyarrangement between the Contractor and the Principal with or without theconsent of the Guarantor or by any alteration in the obligations undertaken by theContractor or by any forbearance,whether as to payment,time,performance orotherwise,but the Guarantor shall be entitled to be informed of such arrangementor alterations.BG/1興尚理筑素前阀Z.ZC.ET
(i)Table of ContentsPageArticles Of AgreementPreliminary RecitalsDate of Agreement1Parties to Agreement and Their Addresses1The Nature of the Works and the Location1The Architect11The Drawings and Bills of Quantities12ArticlesArticle IContractor's Obligations2Article 2Contract Sum2Article 3Identity of Architect2Article 4Identity of Engineer and His Functions Stated3Article 5Identity of Quantity Surveyor and His Functions Stated3Article 6Identity of Specialist Consultant and His Functions Stated4Article 7Definitions4.7Attestation/Signatories Of The Parties6Conditions Of ContractClause1.0Contractor's'Obligations1.1Quality of Workmanship,Materials and Goods1.2Discrepancy or Divergence Between Contract Documents2.0Architect's Instructions12.1Contractor to Comply with Architect's Instructions2.2Failure of Contractor to Comply with Architect's Instructions772.3Architect's Power to Issue Instructions2.4Compliance with Architect's Instructions2.5Instructions to Be in Writing2.5.()Architect's Instructions Not Given in Writing2.5(iComplying with Architect's Instructions Not Given in Writing7777772.6Services of Notices and Architect's Instructions3.0Contract Documents63.1Contract Documents and Their Custody3.2Copies of Documents3.3Further Drawings or Details3.4Works Programme3.5Work Programme Not Part or Incorporated into Contract Documents3.6Contractor Not Relieved of Obligations or Responsibilities3.7Availability of Documents3.8Return of Documents88888888883.9Limitation of Use of Documents3.10As-built DrawingsZ.沁.ET
(i)Table of ContentsPageConditions Of ContractClause4.0Statutory Obligations,Notices,Fees And Charges4.1Statutory Requirements4.2Variations from Contract Drawings to Meet Statutory Requirements4.38Conforming to Statutory Obligations94.4Fees or Charges5.0Levels And Setting Out Of The Works95.1Inaccurate Setting Out96.0Materials,Goods And Workmanship To Conform To Description,Testing And Inspection96.1Standards of Works,Materials,Workmanship and Goods96.2Production of Vouchers6.39Inspection and Testing6.4Works,Materials,Workmanship and Goods Not in Accordancc with Contract996.5Failure Of Contractors to Comply with Architect's Instruction107.0Royalties And Patent Rights107.1Indemnity to Employer Against Claims7.210Exclusion of Contractor's Liability to Pay for Patent Rights8.0Site Agent108.1Site Agent and Assistants108.2Instructions to Site Agent08.3Exclusion of Persons Employed on the WorksJ109.0Access For Architect To The Works09.1Access to Works for Architect or His Representative1010.0Site Staff1010.1Duty of Site Staff10t0.2Dircctions Given by Site Staff1011.0Variations,Provisional And Prime Cost Sums1111.1Definition of Variation11.21No Variation Required by Architect Shall Vitiate Contract11.3Architect's Instructions on Prime Cost(PC)and Provisional Sums11.4Valuation of Variations and Provisional Sums11.5Rules for Valuation of Variations111.6Valuation of Direct Loss and/or Expense121L.7Contractor to Submit Necessary Details112.0Contract Bills1212.1Measurement of Building Works12.2Provisions in Conditions to Prevail12.3Correction of Errors or Omissions1213.0Contract Sum1213.1Contract Sum Not Be Adjusted or Altered1214.0Materials And Goods Unfixed Or Off-Site214.1Unfixed Materials or Goods Not to Be Removed14.21Materials or Goods Paid for Becomes Employer's Property14.3Contractor Cannot Remove Them Except for Use Upon the Works1214.4Contractor Responsible for Loss or Damage to Materials or Goods1運筑Z.沁.ET
评星:
  • 0
  • 0

作品评论(0)

登录 后参与讨论
相关推荐:
本站所有资源由用户上传,仅供学习和交流之用;未经授权,禁止商用,否则产生的一切后果将由您自己承担!素材版权归原作者所有,如有侵权请立即与我们联系,我们将及时删除
浏览:79 次数:0
下载:2.00 收藏:0
等级:
编号:215141 0
文件格式:zip-rar
文件大小:17.75MB
投稿:1001 进入
上传时间:2022/9/18 5:06:42
如有侵权请联系删除

您可能在找这些:

网站首页 典尚平台 建筑素材 三维模型 室内装修 视频素材网 上传教程 帮助中心 热门搜索 版权申明 关于我们 联系典尚

Copyright © 2000-2020 www.jzsc.net.粤ICP备07047611号 All Rights Reserved.

客服QQ:609470690 客服电话:0755-83549300 深圳市典尚风设计有限公司

Copyright© 2016典尚平台 JZSC.NET

网站推荐使用腾讯、Chrome浏览器浏览,不推荐360,很卡

粤公网安备 44030302000908号

QQ咨询
推广分享
×
复制本页url网址

推广详情

如您已登录,分享网址将自动加载您的推广编号,您将获得2元/注册用户的奖励。

推广记录  积分记录

网站首页
回顶部