门汽ISERINLETTER-SPECIAL莱瑟林来信专稿A (RE-)DEFINITION OFBIM:PROCESS VERSUSTECHNOLOGYBM的重新定义:过程与技术杰里·莱瑟林/王新译Jerry Laiserin Translated by Wang Xin[编者按本文是杰里菜瑟林先生最新完成的文章,内容是关于BM的重新定义·众所周知,由于他在2002年发表的“比较苹果与橙子”的文章在BM的发展史上被看成一个里程碑,并使BM这一术语被业界广泛接受而且迅速风靡全球的设行业,莱瑟林先生认为作为BM的“教父”和“BM°一词的推动者,他有权发表他自己对于BM的重新定义.什么是Building InformationWhat is building information modeling (BIM)?Modeling(BiM"?这个答案取决于The answer depends cn the end purpose of the给它下定义的那个人的最终用意。person defining it.Most software developers/大多数软件开发商、营销商,通常marketers cynically define BIM in terms of只根据他们各自软件能够提供的whatever their respective software offering功能来给BM下定义:许多学术研happens to do.Many academic researchers see究人员,把BM看作是理论上的理BIM as a theoretical ideal not necessarily ready想,而不一定是在现实世界中可for real-world deployment (after all.if it were real-以应用实施的(如果在现实世界里world-ready.it wouldn't be an appropriate topic for可以实施,那它就不太适合于学术scholarly research.would it?).To self-proclaimed研究了,对吧?):对于那些没有"leading authorities"as well as some software-实践经验的,在设行业里自称是reviewing journalists with no practice credentials“领导性权威”和软件评论员来in any AECO discipline.BIM is-well,who cares说,他们如何来定义BM?其实what those folks think?没什么人在乎他们是怎么想的。作为被维基网站(www.BIM Definedwikipedia.com)称为帮助BlM这一As the person credited by Wikipedia with术语“大众化和标准化”的人来helping to popularize and standardize"the说风.我一直觉得我有权利来推出terminology of BIM,I always have felt I have我个人对于BIM的定义。在2005a legitimate claim to putting forward my own年4月“乔治亚理工大学/莱瑟林definition of BIM.In my keynote talk at the April来信”的BM大会上,我曾议.2005 GeorgiaTech/LaiserinLetterTM Conference141994-2011 China Academic Journal Electronic Publishing House.All rights reserved.www.cnki.net闐.ET
Building Information Modeling-on BIM,I proposed that:个表述系统。在一个项目的生命周Building Information Modeling is a system of期过程中,它保持着多维的.数据representation that maintains multi-dimensionai.丰富的“视图”:用来支持沟通data-rich "views"throughout a project lifecycle(数据共享),协调(运用共享的to support communication (sharing data);数据)·模拟(应用数据来预测)coordination (acting on shared data):simulation和优化(应用反馈来改进设计、文(using data for prediction):and optimization (using件和成果)。网feedback to improve design,documentation and为此.我还强调了以下观点:delivery)..网BIM是一个业务流程,不是一个软To add to this definition,I emphasized my件。成功的设行业的业务程序已view that:经把BM实践当作过程。因此.通BIM is a business process.not a software过软件来表达该过程且使之自动program.Successful AECO businesses already化,将使一切随之而改变。practice BIM as a process.Everything an AECO我的定义与2005年那次会fimm does is geared to its existing (BIM)process.议的其他演讲者的定义大不相同Therefore,automating and externalizing that(直到现在还是不同的),他们process via software will change everything.的定义来自软件商、学者,设计My definition differed (and still differs)greatly师和筑商的混合体。他们的本from those of other presenters at that 2005性和共同利益使得他们愿意看到conference,which comprised a mix of softwareBM被视作软件。我目前的观点还vendors,scholars,AEs and builders,all with a代表了自从我在2002年“莱瑟林natural,mutual interest in seeing BIM as software来信”中,第一次提出BM的想法My current view also represents an evolution from季今的演变过程行网门Zmy first published thoughts about BIM in The那时候我也掉入了把BM“当LaiserinLetterTM in 2002作对下一代设计软件的描述”问。Even then,I fell into the trap of labeling BiM因此,BM这一术语便具有双重意"as a description of the next generation of design义:一个过程,以及一个自动化和software Consequently,the term BIM has外在化这一过程的某些部分的软件come to mean both:a process;and a software技术。technology that automates and extemalizes somepart(s)of that process过程而非技术为了完全澄清。我的观点如Process Over Technology下:BM是百分之百的关于过程To be completely clear.my current view(和过程的变化的和百分之零is that BIM is 100 percent about process (and的关于技术的选择。用设施管理process change)and zero percent about the(FM)领域打个比方,大家似乎choice of technology.By way of analogy,consider对“设施管理”和“计算机辅助设the facility management (FM)field,wherein folks施管理”的区别很清楚。前者代表seem pretty comfortable with the distinction设施管理者所做的事情(一个过between "facility management,"which is the程),而后者只是设施管理者用来stuff that facility managers do(a process)versus自动完成一些过程的特定的一套软"computer-aided facility management"(CaFM).件技术。which is a specific set of software technologies我衷心希望用“CaBIM°”来that help facility managers automate some of the'r代表自动执行一些过程的软件技processes.术.从而与BM过程(上面定义过As much as I may wish for adoption of的)本身加以区分。此后全球的"Computer-aided Building Infommation ModelingTM1451994-2011 China Academic Journal Electronic Publishing House.All rights reserved.www.cnki.net理素村网Z..ET
筑行业可以从BM的模棱两可的.(or CaBIMTM)as a way to distinguish the过程与技术双重含义的境地中摆脱software that automates parts of the BIM process出来。(as I defined it above)from the BIM processitself.at this late date it appears the global什么是鱼所不知邋的?building industry must resign itself to ambiguous.然而,过程与技术的区别不仅dual usage of the term BIM as process and/or体现在语义学的层面。加拿大出生technology.的媒体预言家,马歇尔·麦克卢汉(Marshall McLuhan)在1968年的What Fish Don't Know著名观察中注意到:“鱼类对于一However,this distinction between process件事情是一无所知的,那就是水。and technology is more than mere semantics.因为它们不具备反环境的意识,所Canadian-born media prophet Marshall McLuhan以他们不会意识到他们所生存其中famously observed in 1968."One thing about的环境元素(水)”阿。如果拿which fish know exactly nothing is water,since筑设计师,施工企业和业主及运营they have no anti-environment which would商来作比较,缺乏对于(非自动运enable them to perceive the element they live in.行的)BIM作为一个过程这种“反For building designers,constructors and owner-环境”的意识,是不可能完全了解operators.the analogy is clear:it is impossibleBM自动运行技术的。反过来讲,to fully understand BIM automation technology所有的设行业的参与者,不断地without acknowledging the "anti-environment"of学习非自动运行的,或者自动运行(un-automated)BiM as a process.Conversely.之前的BM过程:把它与新的“反every participant in AECO continues to learn more环境”的BIM自动运行技术对比about BIM,the un-automated or pre-automated(例:如第-代的Co用产在把考争o命9rn9列to te ew岘SC绘图与当时新出现的“反环境“的environment of BIM aufomation technology (just计算机自动绘图进行比较,他们对as,for example.first-generation CAD users came于手绘图有更好的了解。to better understand hand drafting by comparing这类区别(自动化前的过程it to the then-new anti-environment of computer与自动化技术)的案例充满了整automated drafting).个技术更新的历史。计算机为基Cases of this distinction (un-automated础的商业过程自动化的最常用的process versus automating technology)abound案例是,1988年哈佛大学商学院throughout the history of technology adoption.For的教授苏珊娜,朱伯夫(Shoshanathe general case of computer-based automationZuboff)将这一区别称为“信息of business processes.this distinction was化”(informating)。朱伯夫教授labeled by Harvard Business School professor写道:“是什么使它将信息技术与Shoshana Zuboff in 1988 as "informating.'早期的机械技术区分开来呢?信Professor Zuboff wrote:息技术是用来再生,扩展和改进代"What is it,then,that distinguishes替人类的机器的过程,它持续不断information technology from earlier generations of地完成着不尽相同的任务。这种装machine technology?As information technology置自动执行将信息翻译为行为,也is used to reproduce,extend.and improve upon可以将自动执行的行为转化为数the process of substituting machines for human据。由此生成新的信息流…同样agency.it simultaneously accomplishes something的自动翻译系统也可以生成一个大quite different.The devices that automate by规模的机构运行概况”冈。准确地translating information into action also register data说。“大规模的机构运行概况”构about those automated activities.thus generating成了非自动或前自动BM过程的各new streams of information...The same systems1461994-2011 China Academic Journal Electronic Publishing House.All rights reserved.www.cnki.net闐Z..ET
方面。也就是在BIM自动运行技术that make it possible to automate...transactions出现之前我们不能完全感知的各个also create a vast overview of an organization's方面。如果我们把BM自动技术的operations...[emphasis added]最后阶段认为是完全的自动化和一It is precisely that "vast overview of...体化.那么我们就会得出类似我在operations"that constitute that aspect of the un-斯坦福大学“一体化设施工程中automated/pre-automated BIM process that we in心”的朋友们称为“虚拟设计和施the design and building industries were unable to工”或VDC这样的概念。那么,如fully perceive before the advent of BIM automation果VDC代表第N度的BIM自动化技technologies.If we take the end state of BIM术.我议把零度的BM自动化技automation technology to be full automation and术(即完全非自动化和非一体化的integration of BIM process,we would arrive atBM过程)称为“旧有的设计与施what my friends at Stanford University's Center for工”或LDCIntegrated Facility Engineering(CIFE)call "VirtualDesign and Construction"or VDC.Then,if VDC一个新框架represents the nth degree of BIM technology尽管我的这篇论文开始就以似automation,I propose that the Oth degree of BIM乎武断的态度来阐述非自动化BIMtechnology automation (i.e.,fully un-automated过程与自动化BM技术的区别,但and un-integrated BIM process)be labeled我希望由我创造的LDC于VDC之间"Legacy Design and Construction"or LDC.的区别而衍生出的分类法不是过于武断的。实际上,我相信这恰恰为A New Framework重新审视BM作为过程和技术提供Although I started this essay with what may了有用的框架.并且帮助理解这两have seemed an arbitrary distinction between极润的连续性17BIM as an un-automated process and BIM as an在此只举一个例子。当多年前automation technology,I hope that the derivative“互操作性国际联盟”(A)重新dichotomy I have developed between LDC命名为“buildingSMART”时.这and VDC seems less arbitrary.In fact.I believe种命名法引出了一系列有趣和具有it to provide a useful new framework for (re-)潜在麻烦的问题。当时.我私下里considering BIM both as process and technology向lAI/buildingSMART的几个领头的and for understanding the continuum between倡导者询问:我和其他实践者如何these poles.知道我们是在"building smart?"To cite just one example,when the我得到的非常滑稽的回答就是:International Alliance for Interoperability (IAl)"我们的做法就是building smartrebranded itself a few years back as the(直译为:聪明地造)。以我buildingSMART Alliance,the new nomenclature非常“直线性的思维方式”,raised some interesting and potentially troubling我又问:这是个二选一的问题questions.At the time,I inquired privately of some吗?如果以你们的标准,我没有leading proponents of LAl/buildingSMART exactlybuilding smart,换言之,我就是在how could or any other practitioner know whetherbuilding stupid?(直译为:愚笨we were,in fact,"building smart?"The consistent地造)当然,这应该是修辞学上reply.offered not entirely facetiously.was to the面的问题,因为我问过的每个1A/effect that "building smart is what WE do."In mybuildingSMART的人.没有人选择often literal-minded fashion,I followed up with,"so回答我的问题。it's a binary choice?If I am not building smart-in从我上面概述的LDC-VDC关联other words.YOUR way-then am I building的内部来看,关于ouildingSMARTstupid?"Clearly this must have been perceived as的问题不一定是个二选一的问题,a rhetorical question.as no one I asked within IAl/1994-2011 China Academic Journal Electronic Publishing House.All rights reserved.www.cnki.net蜀Z.JZC.ET
因为它里面存在“聪明”的程度这bu.ldingSMART chose to provide an answer样的门槛。门槛上面是广受欢迎的Viewed from within the LDC-VDC continuumbuildingSMART.以及门槛下面的I outlined above,however,the buildingSMART应该避免的“愚笨地设”。真实question need not be a simple binary choice世界里面机构的造真实筑过wherein there is some threshold value of程,不会也不可能按照某种生硬的"smartness"above which is the sought-after准则来运作:虽然这些准则对于某buildingSMART and below which is the to-be-种只对他们自己的研究.报告和标shunned "bulding stupid."Real-world organizations准负责的虚拟机构所来说是近乎完building real buildings do not and cannot operate美的。according to the sort of abrupt criteria that may然而,"聪明造”在seem perfectly reasonable to virtual organizations某种程度上来讲,应该是IAI/responsible only for generating their own studies,buildingSMART)所应保留的.令人reports.and standards.尊重的目标:现实世界中,设计和While "building smart"in some absolute施工需要通过不同层次的“聪明sense is and should remain the admirable goal of造”·来达到我所描述的从LDC到IAI/buildingSMART.the real world of design andVDC的.革新的关联。即使从语言construction needs an evolutionary continuum to学角度来讲,现存的“聪明”一词progress from what I call LDC to VDC via various也是指一个或多个阶段:其中一个stages of "building smarter."Even in linguistic terms.阶段比之前的“更聪明”:直到最the existence of a "smart"implies the existence of终阶段一也就是所谓达到“最聪one or more states in which things are "smarter明”的阶段。until some ultimate state of "smartest"is attained.BIM的衍生物Derivaion fMJ.NE综上所述.全球设行业(包To summarize.the global building industry括所属的筑.工程、施工和业(and its constituent sub-industries in architecture主及运营等行业)正在进行经历engineering.construction and ownership-一场由背后的运营方式(作为过operations)is going through a shift that is driven程的BM)的自动化(作为技术的by automation(through BIM as technology)of theBlM)所驱动的转变。换句话说.underlying modes of operation(BIM as process).是沿着连续统从LDC到VDC的转Stated in slightly different terms,it is a shift变。新的、或者更先进的点会出现along a continuum from LDC (legacy design and在这个连续统上面,相较于早前construction)towards VDC (virtual design and的,不是很先进的点来说,他们可construction).Later or more-advanced points along能被称之为”更聪明的造”。that continuum may be described as "buildingBIM自动化技术所属于为聪明造smarter"than earlier or less-advanced points.BlM所用的众多工具和技术之中。automation technologies count among the tools像斯坦福大学ClFE这样的研and techniques for building smarter.究机构.将终极阶段(VDC)作为Institutions such as Stanford CIFE have目标:他们通过研究和教学来增进an end-state (VDC)in sight,.and offer research全球设行业朝此方向发展。像and instruction to advance the global buildinglAl/buildingSMART:这样的机构.industry in that direction.Organizations such as通过立标准来促进先进的用户IAl/buildingSMART propose standards that may沿着我所描述的从LDC到VDC的方facilitate enlightened users'progress along what I向发展。像BM模型生成工具软件call the LDC-VDC continuum.Businesses such as商这样的企业们.他们通过各自不vendors of BIM model--authoring tools offer implicit同的市场接受度来提供含蓄的救salvation through adoption of their respectively1994-201I China Academic Journal Electronic Publishing House.All rights reserved.www.cnki.net理Z.ZC.ET
助(我们的BIM比他们的BIM“更proffered tools ("our BIM is 'BIMmier'than加BM")。在未来的专栏中,我their BIM").In future columns I shall endeavor会努力展示更加严谨的、作为过程to present a more rigorous derivation of BIM的BM的衍生物:以及作为技术的as process and the ways in which BIM asBM是如何来帮助实现这一过程的technology derives from and serves to help自动化的。automate that process.注释1由于中国大进地区经常使用的.对于ouding intormaton mod8ng一词的中文翻泽存在偏差.到发裤为止.没有一个公认的中文译文可以宗使用.故在此保留类文原文(及缩写B),2 en.wiopedia.org/wil/Bulding_nformation_Modeing (last accessed June 13.2011).32005年4月在“乔治亚理工大学/菜瑟林来信”的BM休会上所作的主题报告,4此处指he LaiserinLeter,Comparing Pommes and Naranjas°,即"比较苹果与裙子”那篇文章.原文tp/ww.leiserinc0 n/features/s815A8atre01.0o1与中文译刊登在(筑信作)2011年4月期(第143期}的"EM传栏“中P136-139.5此术语的商标所有权声明并非意图以知识产权华利.而是希望能控制其含麻(免得由于油用而导致术语的格调被降低》,不愿引用我们称之为C3BM的米语作注新商标者.可自由采用BM-ready或者B4Cape标识。6马歌尔麦克A汉VcLuhan.M3shsl与昆订-菲與窗Quentin Ficrel所著的(地球村的战争与和平》War and Peace in theGloba Viagel 1968.7苏群播朱伯夫Shoshana Z,o)1988年所著的(智M机尊时代,生产力的末来),Footnotes1.en.wkipediaorg/wki/Buiding_ntormation_Modoing fast aocossed June 13.2011)2.Apnl 2005 GeorgiaTechLaisernlLetter Conference on BM.keynote address3.The LaisernLetter"v 'Comparng Pommes and Naranas"http //ww.lasorn com/leaturos/issue15/eature01.pho)and republshedby Being institue of Archtectural Design (BIAD)in Archicreation.Apri 2011.Number 143.pp 136-1394 Note te asserton of trademark nghts to the termnology.This is not an attempt to monetio the ntelectual property.but to exercisecontrol over the meanng fiost the torms be degraded by indscriminate usage).Those who prefer not to acknowledge trademaked termsare free to label wha:I cal CaBMr as BM-ready or BM-capable5.McLhan,Marshall Quentn Fiore.War and Peace in the Gicba Vilege.19686.Zubol Shoshana.in the Age of the Smart Machine:The Future of Work and Power.1988U作者:杰里菜瑟林,ACADIA的督导委员会委员国际设施管理协会、美国筑师协会(AA)的全美蓝事会成员卡内基麦隆大学校长咨询委员会成员美国退伍军人部《BIM执行导则》的技术编辑《筑实录》,CADence和Cadalyst等杂志的特约编辑和专栏作家翻译:王新,美国XTWO国际有限责任公司合伙人.设计总监,BM战略顾问.美国国家筑科学院(NBS)成员,buildingSMART联盟成员,美国"国家BIM标准”(NBIMS)委员会委员收稿日期:2011年4月原文发表于杰里:莱琴林(Jery Laiserin)先生的网站?A1 SERINLETTER°,网址为www.laiserin.com,本刊与美国的王新(XinWang)和杰里,莱瑟林本人合作,将对杰里·莱瑟林有关BM的系列文章进行全文转藏,以城读者。该文章的英文版权属于杰里菜器林先生,经他本人授权由XTWO公司合伙人、BM战略顺问王新(美国)担任翻译、由《实创作》杂志社在中国编辑出版,该文章所有中英文版未经我社和合作方的允许不得再使用、编辑、出版或再以任何方式发表或转戴在其他媒体上。此文注册为?Jerry Laiserin,2011.版权所有.This article is originally published on Mr.Jerry Laiserin's website "www.laiserin.com".ARCHICREATION has reached an agreement with Xin Wang"U.S"and Jerry Laiserin privately to reprint full text of articles about BIM writtenby Jerry Laiserin.The copyright of the article's English version belongs to Mr.Jerry Laiserin.With authorization from Mr.Jerry Laiserin,the article is translatedinto Chinese by Xin Wang,a partner and BIM strategy consultant of XTWO"U.S.",and published in China by ARCHICREATION.Both Chinese and English versionsof the article aren't allowed to be reused,edited,and published in other mediathrough any other manners without the permission of ARCHICREATION and ourpartners.Copyright Jerry Laiserin,2011.All rights reserved.g1994-2011 China Academic Journal Electronic Publishing House.All rights reserved.www.cnki.net到素前网Z.ZC.ET
评星:
  • 0
  • 0

作品评论(0)

登录 后参与讨论
相关推荐:
本站所有资源由用户上传,仅供学习和交流之用;未经授权,禁止商用,否则产生的一切后果将由您自己承担!素材版权归原作者所有,如有侵权请立即与我们联系,我们将及时删除
浏览:126 次数:0
下载:2.00 收藏:0
等级:
编号:212087 0
文件格式:pdf文本
文件大小:496.40KB
投稿:1001 进入
上传时间:2022/9/10 4:51:51
如有侵权请联系删除

您可能在找这些:

网站首页 典尚平台 建筑素材 三维模型 室内装修 视频素材网 上传教程 帮助中心 热门搜索 版权申明 关于我们 联系典尚

Copyright © 2000-2020 www.jzsc.net.粤ICP备07047611号 All Rights Reserved.

客服QQ:609470690 客服电话:0755-83549300 深圳市典尚风设计有限公司

Copyright© 2016典尚平台 JZSC.NET

网站推荐使用腾讯、Chrome浏览器浏览,不推荐360,很卡

粤公网安备 44030302000908号

QQ咨询
推广分享
×
复制本页url网址

推广详情

如您已登录,分享网址将自动加载您的推广编号,您将获得2元/注册用户的奖励。

推广记录  积分记录

网站首页
回顶部